3b_main

3b. Excavation of the Coelophysis quarry

Once the level at which the bone bed intersected the slope was located, a bulldozer was used to begin the excavation of the Coelophysis quarry by digging away a large, shelf-like area about 6 ft above the bone bed and covering an area of about 60 ft across and 12 ft back into the slope.